Aiming to solve the disconnect problems between 3D modeling and the construction of the actual engineering, such as the difficulty of the extraction of model's information, the difficulty to modify the changes of the engineering and the complexity of the process of construction, this paper chose the technology of BIM and VB to make the information of 3D modeling better serve the construction. First, according to an actual sluice project, we extract the needed construction drawings and make the project budget through the secondary development of Revit after building the model's family parameters of the sluice. At the same time, we use VB technology to design the window for the configuration of the construction's resources to exert the chart of the construction's process dynamically on the base of the data from the budget we made before. Finally, we can build an application system that modeling, drawings, budget, construction process and the plan of manual work, materials and machinery will be included, in which we can make a preliminary exploration on how to use the information of 3D modeling in the construction of the sluice project, from the collection, management to the share of the information to realize the dynamic correlation of 3D modeling. According to the research, the combination of VB and BIM will effectively improve the management of the construction schedule and further improve its efficiency, which has a great applicability and practicability.