• (1)2008-2022年连续15年年被中国情报信息研究所评价中心评为“中国科技核心期刊”
  • (2)2019-2024年连续三届被中国科学院文献情报中心中国科学引文数据库CSCD(核心库)收录
  • (3)2021年入编北京大学图书馆《中文核心期刊要目总览》2020年版
  • (4)2020-2022连续三年入选《科技期刊世界影响力指数(WJCI)报告》
马永胜, 董旭荣.基于水量联合调度的“十四运”水景观运行研究水资源与水工程学报[J].,2021,32(5):144-150
基于水量联合调度的“十四运”水景观运行研究
Operation schemes of “the 14th National Games” water landscape based on water quantity joint regulation
  
DOI:10.11705/j.issn.1672-643X.2021.05.19
中文关键词:  “十四运”水景观  梯级橡胶坝群  水量联合调度  浐灞河流域
英文关键词:water landscape of “the 14th National Games”  cascade rubber dams  water quantity joint regulation  the Chan and Ba River Basin
基金项目:
作者单位
马永胜, 董旭荣 (陕西省水利电力勘测设计研究院 陕西 西安 710001) 
摘要点击次数: 631
全文下载次数: 237
中文摘要:
      针对 “第十四届全运会” 陕西省主场馆所在的浐灞河流域,选用“全运湖”水景观运行流量与持续时长为目标函数,构建流域梯级橡胶坝和水库群水量联合调度模型,采用协同粒子群算法求解“十四运”期间3个阶段水景观运行方案,通过2010-2019年“十四运”同期“全运湖”日尺度模拟运算,判定控制坝提前充水蓄坝历时,对比分析不同情景组合下水景观保障程度,提出满足“全运湖”水景观运行要求的下泄及错时补水方式,为“十四运”水景观科学运行提供技术支撑。
英文摘要:
      The Chan and Ba River Basin is the location of the main venue of “the 14th National Games”, which is held in Shaanxi Province this year, the “National Games Lake” rubber dam was therefore constructed and the water landscape of cascade rubber dams came into being. Here, the water landscape flow rate and operation time were selected as the objective functions to establish the joint regulation model of cascade rubber dams and reservoirs. Then, the coordinated particle swarm optimization algorithm (CPSO) was used to solve the different operation schemes in three stages of “the 14th National Games”. According to the daily scale simulation of the “National Games Lake” of last 10 years, the time in advance of the water filling and storage of the control dam was determined. Finally, the guarantee degrees of different operation schemes were compared and analyzed, and the landscape discharge flow and water replenishing mode at stagger hour was proposed, so as to provide technical support for the scientific operation of the water landscape during the period of “the 14th National Games”.
查看全文  查看/发表评论  下载PDF阅读器
关闭