• (1)2008-2022年连续15年年被中国情报信息研究所评价中心评为“中国科技核心期刊”
  • (2)2019-2024年连续三届被中国科学院文献情报中心中国科学引文数据库CSCD(核心库)收录
  • (3)2021年入编北京大学图书馆《中文核心期刊要目总览》2020年版
  • (4)2020-2022连续三年入选《科技期刊世界影响力指数(WJCI)报告》
朱记伟, 王江瑞, 刘阳阳.基于COWA-灰色定权聚类法的城市河流生态治理项目运营期绩效评价水资源与水工程学报[J].,2021,32(1):14-21
基于COWA-灰色定权聚类法的城市河流生态治理项目运营期绩效评价
Performance evaluation of urban river ecological governance projects in operation period based on COWA-grey fixed weight clustering method
  
DOI:10.11705/j.issn.1672-643X.2021.01.03
中文关键词:  城市河流生态治理项目  绩效评价  运营期  COWA算子  灰色定权聚类
英文关键词:urban river ecological governance project  peformance evaluation  operation period  combination ordered weighted averaging(COWA) operator  grey fixed weight clustering
基金项目:国家自然科学基金项目(71774132);陕西省水利科技计划项目(2020SLKJ-22)
作者单位
朱记伟1,2, 王江瑞1,2, 刘阳阳3 (1.西安理工大学 省部共建西北旱区生态水利国家重点实验室 陕西 西安 710048 2.陕西高校新型智库生态水利与可持续发展研究中心 陕西 西安 710048 3.延安大学 陕西 延安 716000) 
摘要点击次数: 931
全文下载次数: 401
中文摘要:
      城市河流生态治理是推进生态城市建设的重要举措,生态治理项目运营期的绩效水平高低是项目建成后能否长远发挥综合效益的关键。从组织管理、监督管理、工程管理以及综合效益管理4个方面,选取18个评价指标构建了城市河流生态治理项目运营期绩效评价指标体系,建立了基于COWA-灰色定权聚类法的城市河流生态治理项目运营期绩效评价模型。利用该模型对西安某河流生态治理项目运营期绩效水平进行了评价,结果表明:该项目运营期综合绩效评价值为7.806,等级为良好,其中工程管理二级指标绩效水平最高,结果为优秀,其余3项二级指标绩效水平均为良好,评价结果与项目实际情况基本相符。研究结果可以客观反映城市河流生态治理项目运营期的绩效水平,可为其管理水平提升提供参考。
英文摘要:
      Urban river ecological governance is an important aspect of the construction of ecological city, and the performance level of a project during the operation period is the key to the long term comprehensive benefits it brings after the completion. We selected 18 evaluation indexes from four aspects of organization management, supervision management, engineering management and comprehensive benefit management, and constructed the performance evaluation index system of urban river ecological governance project in operation period. Then a performance evaluation model of urban river ecological governance project in operation period was established based on combination ordered weighted averaging(COWA)-grey fixed weight clustering method. The performance level of a river ecological governance project in operation period in Xi’an was evaluated using this model. The results show that the comprehensive performance of the project during the operation period is evaluated as 7.806, which is classified as “good”. Among the indicators, the performance level of secondary indicators of project management is the highest, and the result is “excellent”. The performance level of the other three secondary indicators is “good”, which is basically consistent with the actual situation of the project. The results can reflect the performance level of urban river ecological governance projects in operation period objectively and can provide some reference for the improvement of their management.
查看全文  查看/发表评论  下载PDF阅读器
关闭