• ▶ 2008-2024年被中国情报信息研究所评价中心评为“中国科技核心期刊”
  • ▶ 2019-2024年连续三届被中国科学院文献情报中心中国科学引文数据库CSCD(核心库)收录
  • ▶ 2021、2023年入编北京大学图书馆《中文核心期刊要目总览》
  • ▶ 2020-2024连续四年入选《科技期刊世界影响力指数(WJCI)报告》
倪培桐, 陈卓英.大亚湾玻沙山岬角动力特征及温排水输运分析水资源与水工程学报[J].,2017,28(4):150-157
大亚湾玻沙山岬角动力特征及温排水输运分析
Analysis on dynamic characteristics and transportion of cooling water of Boshashan headland in Dayawan Bay
  
DOI:10.11705/j.issn.1672-643X.2017.04.25
中文关键词:  岬角动力过程  取排水口布置  岸线规划; 温排水数学模型; 温排水输运
英文关键词:Headland dynamic process  layout of the cooling water drainage port  coastline planning  transportion of cooling water  transportation of colling water
基金项目:广东省水利科技创新项目(2016-12)
作者单位
倪培桐1,2,3, 陈卓英1,2,3 1.广东省水利水电科学研究院 广东 广州 510630
2.广东省水动力学应用研究重点实验室 广东 广州 510630
3.河口水利技术国家地方联合工程实验室 广东 广州 510630 
摘要点击次数: 1679
全文下载次数: 849
中文摘要:
      近岸地貌单元形成的复杂动力结构对于物质输运及工程方案布置有重要意义。本文建立了大亚湾玻沙山水域温排水数学模型,对大亚湾平海电厂冷却水输移扩散进行模拟计算,对比分析了南排与北排、南取与北取、深排与浅排等布置形式在本工程中的适宜性。结果表明:电厂防波堤、湖头角及玻沙山岬角对烟囱湾的屏蔽作用是南排北取方案废热窝积的原因,且使管排深排方案的取水温升比明渠浅排高0.21℃;规划碧甲港在地貌上形成了电厂区域的双峡口单元,动力上形成两个双向射流结构,加剧了南排方案热水窝积,而对北排方案带来取水温升降低0.2~0.3℃的效益;取排水工程布置方案选择宜考虑工程区岸线远期规划调整趋势。
英文摘要:
      The complex dynamic structure formed by the nearshore topography is of great significance to the water transport and the layout of the project. In this paper, the mathematic model was established to simulate the transportion of cooling water and the layout of the cooling water drainage port in Dayawan Bay. We also compared and analyzed the suitability of different arrangements such as south arrangement and north arrangement, south water intake and north water intake, deep arrangement and shallow arrangement. The results show that the shielding effect of the breakwater, the headland of the Hutoujiao and the Boshashan headland on the Yancongwan bay is the reason for the waste heat accumulating in the first scheme, and the temperature rise of the drainage scheme is 0.21 ℃ higher than that of the open channel. Bijia Port form two mouth topography and the two jet structure, which increase thermal pollution area in the first scheme, and is beneficial to the second scheme with temperature decrease of 0.2 ~ 0.3 ℃, and the coastline long - term planning in project zone area should take into account the drainage project layout.
查看全文  查看/发表评论  下载PDF阅读器
关闭