• ▶ 2008-2024年被中国情报信息研究所评价中心评为“中国科技核心期刊”
  • ▶ 2019-2024年连续三届被中国科学院文献情报中心中国科学引文数据库CSCD(核心库)收录
  • ▶ 2021、2023年入编北京大学图书馆《中文核心期刊要目总览》
  • ▶ 2020-2024连续四年入选《科技期刊世界影响力指数(WJCI)报告》
哈丽木热木·阿布都热西提,侍克斌,李玉建.非均质无限深透水地基上土石坝微透水防渗墙渗流控制研究水资源与水工程学报[J].,2013,24(2):114-117
非均质无限深透水地基上土石坝微透水防渗墙渗流控制研究
Study on seepage control of micro pervious vertical seepage control wall of earth-rock dam on the base of heterogeneous infinite deep pervious foundation
投稿时间:2012-12-01  修订日期:2012-12-31
DOI:10.11705/j.issn.1672-643X.2013.02.025
中文关键词:  非均质无限深透水坝基  垂直防渗墙  模型试验  渗流控制
英文关键词:heterogeneous infinite deep pervious foundation  vertical seepage control wall  model experiment  seepage control
基金项目:新疆科技支撑计划项目(201233132); 国家自然科学基金项目(50969010); 新疆水利水电工程重点学科基金资助项目( xjzdxk-2010-02-12)
作者单位
哈丽木热木·阿布都热西提 新疆农业大学 水利与土木工程学院, 新疆 乌鲁木齐 830052 
侍克斌 新疆农业大学 水利与土木工程学院, 新疆 乌鲁木齐 830052 
李玉建 新疆农业大学 水利与土木工程学院, 新疆 乌鲁木齐 830052 
摘要点击次数: 1722
全文下载次数: 1009
中文摘要:
      随着地质条件良好的坝址日益减少,许多水坝已经或将要坐落在非均质无限深透水地基或深厚覆盖层地基上,为了在满足大坝安全运行的前提下尽可能减少渗流量,本文通过物理模型实验就非均质无限深透水地基上的土石坝微透水垂直防渗墙的深度对坝基渗流量的影响进行研究,得出了在非均质无限深透水地基上土石坝坝前水头不变的情况下的垂直防渗墙的有效深度。当悬挂式防渗墙深度大于10倍坝前水头后,坝基的渗流量明显减少的趋势变小,当悬挂式防渗墙的深度大约为20倍坝前水头时,坝基的渗流量基本趋于稳定。
英文摘要:
      Along with the dam locations with the good geologic condition are decreasing gradually, many dams have been or will be located on the heterogeneous infinite deep pervious foundation or deep overburden foundation. In order to meet the safe operation of dam under the premise of as far as possible to reduce the seepage flow, through physical model experiment, this paper studied the influence of the depth of earth-rock dam micro pervious vertical seepage control wall on the base of the heterogeneous infinite deep pervious foundation upon dam foundation seepage flow. It can get the effective depth of vertical seepage control wall when the waterhead in front of earth-rock dam is under unchanged condition. The trend of marked reduction of seepage of dam foundation decrease, when the depth of suspended cut-off wall is more than 10times of the waterhead in front of earth rock dam, the seepage of dam foundation approximately trends to be stable, when the depth of suspended cut-off control wall is about 20times of the waterhead in front of earth rock dam.
查看全文  查看/发表评论  下载PDF阅读器
关闭