文章摘要
刘易庄, 杨树清, 蒋昌波, 隆院男, 邓 斌, 刘虎英.新型防洪减灾措施在洞庭湖中的模拟应用研究Journal of Water Resources and Water Engineering[J].,2020,31(6):132-137
新型防洪减灾措施在洞庭湖中的模拟应用研究
Application simulation of a new flood control and disaster reduction scheme to Dongting Lake
  
DOI:10.11705/j.issn.1672-643X.2020.06.20
中文关键词: 防洪减灾措施  有效防洪库容  蓄水量  洪峰水位  河—湖分离  洞庭湖
英文关键词: flood control and disaster reduction scheme  effective flood control capacity  water storage capacity  peak water level  river-lake separation  Dongting Lake
基金项目:湖南省教育厅科学研究项目(19C0059、19B036)
Author NameAffiliation
LIU Yizhuang1,3, YANG Shuqing2, JIANG Changbo1,3, LONG Yuannan1,3, DENG Bin1,3, LIU Huying4 (1.长沙理工大学 水利工程学院 湖南 长沙 410114 2. School of Civil, Mining and Environmental Engineering, University of Wollongong, NSW 2522, Australia 3.洞庭湖水环境治理与生态修复湖南省重点实验室湖南 长沙 410114 4.湖南省交通规划勘察设计院有限公司 湖南 长沙 410008) 
Hits: 971
Download times: 331
中文摘要:
      为提高洞庭湖的防洪能力及增强其枯水期供水能力,提出了适用于洞庭湖区的新型防洪减灾措施——“河湖分离”方案。通过采用数值模拟方法,以洞庭湖1996年型洪水为例,探讨了“河湖分离”方案对洞庭湖区防洪效果的影响,并统计分析了在应用该方案后洞庭湖1996-2014年的蓄水能力。结果表明:洞庭湖实施“河湖分离方案”后,若遇1996年型洪水,湖内有效防洪库容可由1996年的20.91×108 m3增加至119.01×108 m3,从而增强了洞庭湖的削峰能力。通过统计分析发现,洞庭湖具有很大的蓄水潜力,即使在年极端干旱年份(比如2006及2011年),“河湖分离”方案仍能使得洞庭湖的可用蓄水量超过18.0×108 m3,这说明“河湖分离”方案能有效地缓解洞庭湖区季节性缺水的状况。
英文摘要:
      To increase the lake capability of flood control and water supply, a new flood control and disaster reduction scheme in Dongting Lake is proposed, which is “river-lake separation” scheme. Taking the 1996 flood of Dongting Lake as an example, the effect of the new scheme on flood control in Dongting Lake area and the lake’s water storage from 1996 to 2014 was studied by numerical simulation method. The results show that with the application of the new scheme, the effective flood control capacity could increase from 20.91×108 m3 under the natural condition to 119.01×108 m3 if a flood type of 1996 occurred. Therefore, the peak water level could be reduced significantly. It is found that the Dongting Lake has great water storage potential, with the application of this scheme it can exceed 18.0×108 m3 even in the extreme drought years of 2006 and 2011. Hence, the seasonal water shortage can be significantly alleviated in Dongting Lake area with“river-lake separation” scheme.
View Full Text   View/Add Comment  Download reader
Close
function PdfOpen(url){ var win="toolbar=no,location=no,directories=no,status=yes,menubar=yes,scrollbars=yes,resizable=yes"; window.open(url,"",win); } function openWin(url,w,h){ var win="toolbar=no,location=no,directories=no,status=no,menubar=no,scrollbars=yes,resizable=no,width=" + w + ",height=" + h; controlWindow=window.open(url,"",win); } &et=DCA5CABA83612A9438576D90DF182B5E48242E4B134759229257A8BCE03200722F039F7D8E9DB0ABC05C861924264E26AA1FD1C2BFC1D1865EE98A69B93BFD646D39B7CCE25D8AFC6196977EAD206DE79898CB657A1BF79AE1B514AE3C79418F&pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=3ECA06F115476E3F&jid=BC473CEDCB8CE70D7B12BDD8EA00FF44&yid=0D1D160AB8016934&aid=C76A7301F1A8EE4824D4613B38CF95B4&vid=&iid=B31275AF3241DB2D&sid=7C72DBC13F2D71EC&eid=205BE674D84A456D&fileno=20200620&flag=1&is_more=0">