文章摘要
姚娟娟, 宋莉莉, 刘 存.斜板沉淀池前配水渠的数值模拟及结构优化Journal of Water Resources and Water Engineering[J].,2020,31(5):120-126
斜板沉淀池前配水渠的数值模拟及结构优化
Numerical simulation and structural optimization of water distribution channel between the flocculation tank and sedimentation tank with inclined plate settler
  
DOI:10.11705/j.issn.1672-643X.2020.05.17
中文关键词: 配水渠  网格絮凝池  斜板沉淀池  计算流体力学  流速场  结构优化
英文关键词: water distribution channel  grid flocculation tank  sedimentation tank with inclined plate settler  computational fluid dynamics (CFD)  velocity field  structural optimization
基金项目:国家自然科学基金青年科学基金项目(51108481);中央高校基本科研业务费资助项目(106112016CDJXY210008);重庆市基础科学与前沿技术研究项目(cstc2017jcyj AX0206)
Author NameAffiliation
YAO Juanjuan, SONG Lili, LIU Cun (重庆大学 环境与生态学院 重庆 400045) 
Hits: 1111
Download times: 416
中文摘要:
      针对配水渠出水优化措施单一、优化效果欠佳的问题,运用CFD软件,采用Realizable k-ε湍流模型对其流速场进行数值模拟,探究了进口宽度(b)和配水渠宽度(B)变化时出水均匀度最优的配水渠长度(L),并优化了挡墙在双段配水渠中的最佳位置。结果表明:配水渠进口集中主流在池内流域空间的扩散程度是出水均匀度的主要影响因素;当b在1 200~1 600 mm范围时,L取1 750~2 250 mm时的出水均匀度最优,若b大于1 600 mm,最优的L值须适当增加,但不应大于3 000 mm;当B为3 900 mm时,L最佳取值为1 750~2 250 mm,当B为5 300或6 700 mm时,最佳的L值应增加500 mm左右;采用双段配水渠时,挡墙位置应设在进口侧,而不应在配水渠的中间位置。该研究可为配水渠的设计提供一定的理论指导。
英文摘要:
      In view of the limited optimization measures of the outflow and their unsatisfactory effects in the design of water distribution channels, we adopted Realizable k-ε turbulence model in CFD software to simulate its velocity field. In the simulation we explored the water distribution channel length (L)for the optimal outflow uniformity with changing inlet widths (b) and water distribution channel widths (B), and optimized the position of sectioning wall in double sectioned water distribution channel .The simulation results indicated that the diffusion of the mainstream at the entrance of the distribution channel was the main factor affecting the uniformity of the outflow. The optimization results showed that, when b was in the range of 1 200-1 600 mm, the outflow uniformity of the distribution channel was optimal when L was 1 750-2 250 mm. If b was greater than 1 600 mm, the optimal L should be increased accordingly, but not more than 3 000 mm. When B was 3 900 mm, the optimal L was 1 750-2 250 mm, and when B was 5 300 or 6 700 mm, the optimal L should be increased by about 500 mm. When double sectioned distribution channel was used, the sectioning wall should be constructed close to the inlet instead of in the middle of the channel. This study can provide some theoretical guidance for the design of water distribution channels.
View Full Text   View/Add Comment  Download reader
Close
function PdfOpen(url){ var win="toolbar=no,location=no,directories=no,status=yes,menubar=yes,scrollbars=yes,resizable=yes"; window.open(url,"",win); } function openWin(url,w,h){ var win="toolbar=no,location=no,directories=no,status=no,menubar=no,scrollbars=yes,resizable=no,width=" + w + ",height=" + h; controlWindow=window.open(url,"",win); } &et=69B9C376FE050A227D39A0202F44EDEFF507CFAA9AF3986DB76656DE2EA1E6EEE6F3EA96802A0C53E7C4B37DFFC6F9A2E65130FD198FB1EE234883D5B6DF5513DDD99460A70864EE82CABC9972CC8559613D5587123EFAE25BAF7346CE786CD3C65805821076C7E514ADF0B3C3389D5AE4719FF6FCE6DFB016AAAC2EC42976D5E14BE65079A44E47366B6F3E04BB8DC32E70BDA27246143EA6A97A4D0FFBF3C9&pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=3ECA06F115476E3F&jid=BC473CEDCB8CE70D7B12BDD8EA00FF44&yid=0D1D160AB8016934&aid=E91612AB43BC37D47724334078445EFE&vid=&iid=94C357A881DFC066&sid=2B5DE8A23DCEED39&eid=6FBD78E3BAB60869&fileno=20200517&flag=1&is_more=0">