文章摘要
李文欣, 张晓宏, 陈建国.水电站过渡过程计算中尾水系统糙率的取值研究Journal of Water Resources and Water Engineering[J].,2020,31(3):175-179
水电站过渡过程计算中尾水系统糙率的取值研究
Choosing roughness value of tailrace system in transition process calculation of a hydropower station
  
DOI:10.11705/j.issn.1672-643X.2020.03.25
中文关键词: 水电站尾水系统  糙率  水力过渡过程  最低涌浪水位  尾水管进口最小压力
英文关键词: tailrace system  roughness  hydraulic transition process  lowest surge level  minimum pressure at draft tube inlet
基金项目:国家自然科学基金项目(51279162)
Author NameAffiliation
LI Wenxin, ZHANG Xiaohong, CHEN Jianguo (西安理工大学 水利水电学院 陕西 西安 710048) 
Hits: 1220
Download times: 482
中文摘要:
      在水电站水力过渡过程计算中,为了满足调节保证计算的要求,管道各项参数指标的正确选择是至关重要的,合理的参数取值是水电站得以安全正常运行的基本保证。结合某水电站工程实例,采用过渡过程通用软件,通过分别改变调压室前管道的糙率和调压室后管道的糙率,对水电站过渡过程计算中尾水系统糙率的取值进行了深入研究。研究表明:在机组丢弃负荷过程中,在其他条件不变的条件下,尾水系统糙率的变化对尾水调压室最低涌浪水位、蜗壳末段最大压力和尾水管进口最小压力皆有影响,在水电站过渡过程计算中,尾水调压室前、后段糙率均应采用可能的最小值较为合理。这些成果对于同类工程的建设具有一定的参考意义。
英文摘要:
      In the calculation of hydraulic transition process of hydropower stations, for the purposes of regulation and calculation, it is very important to set appropriate values for various pipeline parameters, which is also the primary requirement for safe and regular operation of hydropower stations. In this paper, choosing the right roughness value for the tailrace system in the transition process calculation of a hydropower station is deeply studied by changing the roughness values of the pipelines in front of and behind the surge chamber respectively with the commonly used software designed for the calculation of the transition process. From the calculation results it can be seen that the changes of the roughness values had an impact on the lowest surge level in the tailrace surge chamber, the maximum pressure at the end of the volute and the minimum pressure at the inlet of the draft tube during the discarding load process of the equipment unit when the other conditions remained unchanged. In the calculation of hydropower station transition process, it is suggested that the minimum possible roughness values of the pipelines should be adopted regarding to the perimeter of the surge chamber. These findings can provide some reference for the construction of similar projects.
View Full Text   View/Add Comment  Download reader
Close
function PdfOpen(url){ var win="toolbar=no,location=no,directories=no,status=yes,menubar=yes,scrollbars=yes,resizable=yes"; window.open(url,"",win); } function openWin(url,w,h){ var win="toolbar=no,location=no,directories=no,status=no,menubar=no,scrollbars=yes,resizable=no,width=" + w + ",height=" + h; controlWindow=window.open(url,"",win); } &et=D712D2EB078BE52168737CD376EEBE53FB451E4B3490549D1BA127E3E1B38FEC104EB17DC3FB340D6470DE77F3407C0C6FF5D873FE96A75DCCD547AECA818AF9A2A0AB3F1CAE46FD67D804EE1609014121B839B4509D953636B72C7AF035321D3CC1115ABDE9BBC9&pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=3ECA06F115476E3F&jid=BC473CEDCB8CE70D7B12BDD8EA00FF44&yid=0D1D160AB8016934&aid=47415C07092E978CB369C3A8B21E9BB5&vid=&iid=38B194292C032A66&sid=A58CF3BAE79427D0&eid=E114CF9BB47B65BE&fileno=20200325&flag=1&is_more=0">