文章摘要
袁宏川, 张伟龙, 游佳成.基于改进云模型的水利PPP项目风险分担研究Journal of Water Resources and Water Engineering[J].,2018,29(6):122-126
基于改进云模型的水利PPP项目风险分担研究
Research on risk sharing for water conservancy PPP project based on improved cloud model
  
DOI:10.11705/j.issn.1672-643X.2018.06.18
中文关键词: 水利工程  改进的云模型  前景理论  PPP项目  风险分担
英文关键词: water conservancy engineering  improved cloud model  prospect theory  PPP(public-private-partership) project  risk sharing
基金项目:国家自然科学基金项目(51379110)
Author NameAffiliation
YUAN Hongchuan, ZHANG Weilong, YOU Jiacheng (三峡大学 水利与环境学院 湖北 宜昌 443002) 
Hits: 1532
Download times: 584
中文摘要:
      为更好地解决水利PPP项目风险决策过程中存在的投资者心理和行为认知偏差、决策信息的模糊性以及风险发生的随机性等问题,建立了基于云模型和前景理论的水利PPP项目的风险分担综合决策模型。首先,综合分析水利工程和PPP项目的特征,并联合施工现场调研,构建风险分担决策指标体系;其次,通过改进云模型生成算法建立风险分担指标评语云模型,结合云距离、云可能度等概念,综合前景理论得到云前景价值函数;最后,应用离差最大化方法优选出各风险分担指标的权重,通过模糊合成算法对指标权重和云前景值进行合成计算,然后优选方案。结果表明:使用水利PPP项目风险分担方案决策方法,能够量化不确定性的决策信息,提高备选方案的可比性,使方案决策更加清晰直观。
英文摘要:
      In order to solve current issue about existing water conservancy public-private-partnership(PPP) project risk decision of the investors in the psychology and behavior of cognitive bias, fuzzy decision information and random risk, the PPP project risk sharing scheme model was put forward, which was based on the cloud theory and prospect theory. First, the characteristics of water conservancy project were analyzed, and along with the investigation of construction site, the index system of risk sharing decision-making was established. Second, risk sharing index reviews of the cloud model were established through improved cloud model generation algorithm and the cloud distance and cloud possible degree were put forward, cloud foreground value function was obtained by cloud theory and prospect theory. Finally, the optimal weight of each risk sharing index was calculated based on the deviation maximization method, the fuzzy synthesis algorithm was used to synthesize the index weight and the cloud foreground value, and then the optimal risk sharing plan was selected. The results show that the decision-making method of water conservancy PPP project risk sharing scheme can quantify the uncertain decision information, which can improve the comparability of options and make decision-making more intuitive and clear.
View Full Text   View/Add Comment  Download reader
Close
function PdfOpen(url){ var win="toolbar=no,location=no,directories=no,status=yes,menubar=yes,scrollbars=yes,resizable=yes"; window.open(url,"",win); } function openWin(url,w,h){ var win="toolbar=no,location=no,directories=no,status=no,menubar=no,scrollbars=yes,resizable=no,width=" + w + ",height=" + h; controlWindow=window.open(url,"",win); } &et=FC9DA7BF2F842A3B72E4C24215242D938BD9ECA0B4614E0A820BFA75D6CC0A1C8EC57E6618545FE94D79F0D7BC3D31711631C9F75C91D739B7F09F9F949FD6EF710607A026BFD5BE538D3C38787E1B0684E505E7AD6E3FA4A8C9D07AFCA4B28F&pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=3ECA06F115476E3F&jid=BC473CEDCB8CE70D7B12BDD8EA00FF44&yid=EA357AD73C8E13BC&aid=0B4BF5AC87809E4817EA5D1AEAD36950&vid=&iid=B31275AF3241DB2D&sid=B62E0EEFE746E568&eid=6FBD78E3BAB60869&fileno=20180618&flag=1&is_more=0">