王仁超,杨 雪,荆 珑,潘菲菲.网络进度计划自动生成方法综述Journal of Water Resources and Water Engineering[J].,2013,24(1):138-146
网络进度计划自动生成方法综述
Summary on auto-generation method of network schedule
Received:October 12, 2012  Revised:October 23, 2012
DOI:
中文关键词: 工程项目  进度计划  网络计划  自动生成
英文关键词: project  schedule  network schedule  automatic generation
基金项目:
Author NameAffiliation
WANG Renchao State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China [KH*3D] 
YANG Xue State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China [KH*3D] 
JING Long State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China [KH*3D] 
PAN Feifei State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China [KH*3D] 
Hits: 1475
Download times: 890
中文摘要:
      网络进度计划以其提高工效、缩短工期、降低成本的优势成为工程建设领域不可或缺的重要技术,但网络计划的编制是一项知识密集的工作,需要耗费大量的精力和时间,另外,网络进度计划的应用过程中也存在项目划分不合理,逻辑关系不明确,项目编码混乱等问题,为了更好地利用网络图的优势同时克服网络计划编制困难的缺陷,越来越多的研究者致力于网络计划的自动生成。笔者针对国内外该领域的有关研究,分析了网络进度计划自动生成的必要性,对目前各种自动生成方法的适用情况、操作流程、发展情况等作了详细的分析,最后探讨了这些模型和方法存在的问题以及今后的研究方向。
英文摘要:
      Network schedule is an indispensable vital technology with its advantage of improving work efficiency, shortening duration and reducing cost in the field of project construction. However, the development of the network schedule is a knowledge-intensive work and needs large quantity time and effort. Besides, problems also exist in the application of network schedule, For example, unreasonable project demarcation, inexplicit logical relationships between activities and disordered project coding. In order to make better use of the advantages of the network schedule and contemporarily avoid the disadvantages in construction schedule generation process, more and more researchers dedicated to the automatic generation of network schedule. This paper described the development of the automatic generation of network schedule both inland and abroad, analyzed its necessity and provided the detailed analysis about the schedule generation methods on three aspects such as application area,operational processes and its development. In the end, the advantages and disadvantages of the various methods are refined, the prospect of automatic construction schedule generation was demonstrated.
View Full Text   View/Add Comment  Download reader
Close
function PdfOpen(url){ var win="toolbar=no,location=no,directories=no,status=yes,menubar=yes,scrollbars=yes,resizable=yes"; window.open(url,"",win); } function openWin(url,w,h){ var win="toolbar=no,location=no,directories=no,status=no,menubar=no,scrollbars=yes,resizable=no,width=" + w + ",height=" + h; controlWindow=window.open(url,"",win); } &et=5AA6F558A3006840D689D611FCD3C70C0EF5F48CC410C0CD301DD6E794686A2ECEA4D810F54581DED7DEA86085601206894FA25EC2DF8581&pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=3ECA06F115476E3F&jid=BC473CEDCB8CE70D7B12BDD8EA00FF44&yid=FF7AA908D58E97FA&aid=7E4BA23F4BE8A9D4E4F93823C4D55D12&vid=&iid=CA4FD0336C81A37A&sid=09E495F616948E78&eid=A020552C37306588&fileno=20130133&flag=1&is_more=0">