This article introduced the calculation theory for river channel general erosion, pier local erosion, backwater, stability of river channel, applied this theory into the engineering practice of Kongquehe River multiline bridge, and analyzed the influence of Kongquehe River multiline bridge on the river channel flood discharging, and finally gave out the conclusion whether the planned bridge scheme was feasible.