MU Dongxue,LI Kexun.跨流域调水工程两部制水价研究Journal of Water Resources and Water Engineering[J].,2011,22(6):
跨流域调水工程两部制水价研究
Research on two-part water price of inter-basin water diversion project
  
DOI:10.11705/j.issn.1672-643X.2011.06.238
中文关键词: 跨流域调水工程  两部制水价  水价计算  计算方法  
英文关键词: inter-basin water diversion project  two-part water price  calcuation of water price  calculating method  
基金项目:
Author NameAffiliation
MU Dongxue,LI Kexun MU Dongxue,LI Kexun(College of Environmental Science and Engineering,Nankai University,Tianjin 300017,China) 
Hits: 2013
Download times: 2
中文摘要:
      跨流域调水是解决北方天然缺水的必然选择,却往往由于水价机制不合理,长期亏损,无法稳定地发挥供水效益。因此,跨流域调水工程应该推行更科学、合理的两部制水价。本文分析了适用于跨流域调水不同环节的两部制水价,并提出了可行的计算方法,以期水价管理部门提供水价制定和调整的方法支持。
英文摘要:
      Inter-basin water diversion is a necessary choice to mitigate the shortage of natural water in north area.However,the benefits of water-supply could not be steadily played due to impropriate price mechanism as well as long-time losses.Therefore,two-part water price which is more scientific and more rational should be carried out on iner-basin water diversion project.The two-part water price that was suitable for different segments of the inter-basin water diversion was analyzed,and the feasible method of ca...
View Full Text   View/Add Comment  Download reader
Close
function PdfOpen(url){ var win="toolbar=no,location=no,directories=no,status=yes,menubar=yes,scrollbars=yes,resizable=yes"; window.open(url,"",win); } function openWin(url,w,h){ var win="toolbar=no,location=no,directories=no,status=no,menubar=no,scrollbars=yes,resizable=no,width=" + w + ",height=" + h; controlWindow=window.open(url,"",win); } &et=FC9DA7BF2F842A3B58D39D24017A50527F362B15626E092EC27D4DEB7269D55D625B24F3F2051DD1EE445CA3BD0ADE9B464F21496FFDC860E9759E9268C8F720A631D6134F6D1732&pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=3ECA06F115476E3F&jid=BC473CEDCB8CE70D7B12BDD8EA00FF44&yid=9377ED8094509821&aid=99964277371&vid=&iid=B31275AF3241DB2D&sid=&eid=&fileno=201106238&flag=1&is_more=0">